Home

Precision machined aluminum, stainless and titanium components laid out on a blue workshop table
Dongguan, China · From prototyping to production

Precision CNC Machining Services for Custom Parts

Send a STEP file and get a DFM-reviewed quote within one business day. 5-axis milling, Swiss turning, finishing and inspection run under one roof — and every batch ships held to ±0.01 mm.

ISO 9001:2015 ISO 13485:2016 AS9100D 15+ years · 2,000+ OEM customers
15+
Years machining
3.2M+
Parts a year
2,000+
OEM customers
98.8%
On-time delivery
±0.01mm
Held tolerance
3 days
Prototype lead time
ISO
9001

ISO 9001:2015

Quality management across quoting, machining, inspection and dispatch.

ISO
13485

ISO 13485:2016

Medical device manufacturing control, from material traceability to cleaning.

AS
9100D

AS9100D

Aerospace quality system with documented first-article and change control.

Scope statements, certificates and inspection records are available on request — see quality assurance.

Manufacturing services

One shop. Every route your part needs.

Machining, turning, prototyping and finishing are planned together, so the geometry, the material and the stage of your project decide the process — not the other way round.

Inside the shop

The floor your part actually runs on.

Cutting, turning, finishing and inspection all happen in one building in Dongguan. No job is handed to a partner shop halfway through — the team that reviewed your drawing walks it to the dock.

CNC machining floor at the XHYE plant in Dongguan
Machining floor3-, 4- and 5-axis cells in one bay
CMM first-article inspection in the metrology room
Metrology roomCMM first-article inspection
Assembly, deburring and packing benches
AssemblyDeburr, fit and pack
XHYE factory building in Dongguan, Guangdong
Dongguan plantRunning since 2013
XHYE engineering, production and quality team on the shop floor
Engineering · Production · Quality
The team

Talk to the engineer, not a call centre.

Seven people handle quoting, programming, production and inspection. The name on your quote is the person who answers the technical questions behind it.

Same floor, same shift handover — so a change you raise on Monday reaches the machine before the next run, not after it.

Meet the full team →
James Wang, Senior Engineer
James Wang
Senior Engineer

Engineering · CNC machining · Process optimization

Tomas Liu, Senior Engineer
Tomas Liu
Senior Engineer

CNC programming · Process development

Leo Zhao, Production Manager
Leo Zhao
Production Manager

Production planning · Process control

Tony Liu, Project Manager
Tony Liu
Project Manager

Project planning · Delivery management

Two ways to start

A clearer path from drawing to part.

Bring a finished model, or bring an idea that is not modelled yet. Both routes start with an engineering review instead of a price list.

For ready designs

Start with your CAD file

Send the model, the drawing and the specification together. Tell us material, quantity and finish, and you get a manufacturability report plus a firm price — not a range that changes after tooling.

.step.iges .x_t.stl .dwg.pdf
For ideas and concepts

Develop the part before you cut metal

No model yet? Bring a sketch, a competitor sample or a functional requirement. Our engineers define the interfaces, select the process and prove the design in a prototype before production tooling is committed.

01 Define 02 DFM review 03 Prototype
Process

From quote to dock in five controlled steps.

Every step is recorded against your drawing revision, so a change request mid-project is a documented decision rather than a surprise on the invoice.

01

Review & quote

Manufacturability feedback, tolerance review and a firm price within 24 business hours.

02

Material & setup

Certified stock, fixture design and CAM programming, logged against the drawing revision.

03

Machining

3-, 4- and 5-axis milling plus Swiss turning, with in-process gauging on critical features.

04

Inspection

CMM reports, first-article inspection and material certificates travel with the batch.

05

Finish & ship

Anodizing, passivation, PVD, DLC and heat treatment in-house, then DDP or FOB delivery.

Materials & finishes

The grade on your drawing, controlled in one place.

Material sourcing, machining and surface treatment are scheduled as one chain. Cosmetic, corrosion and hardness requirements are settled before the part leaves the shop, not after it arrives.

Materials

Mill certificates and traceability records are kept per batch, so a material question two shipments later still has an answer.

Finishes & treatment

Decorative, functional and medical finishes are quoted with the machining operation, so the lead time you see includes the finish.

Why XHYE

Engineering support, not just machine time.

Most suppliers quote what you send. We tell you what to change first — and then make the part without the second round of fixtures that change would have cost.

01

DFM before the first chip

Every quote carries a manufacturability review: tolerance stack-ups, tool access, cost drivers and the two or three changes actually worth making.

02

One setup, fewer stacked errors

Five-axis work keeps compound angles and multi-face features in a single datum, so accuracy does not accumulate across three separate setups.

03

Inspection you can audit

CMM reports, first-article inspection sheets and material certificates ship with the batch — as the default, not as an extra request.

04

Consistency from 1 to 5,000

The same CAM program, the same fixture and the same inspection plan follow a part from the prototype run into production.

Questions

What engineers ask before they send a file.

What files do you need to quote a part?
A 3D model in STEP, IGES, X_T or STL, plus a 2D drawing if the part carries tolerances, GD&T, surface finish or critical datums. Add material, quantity and finish and the quote can usually be firm on the first pass.
Can you machine a single part?
Yes. Prototype quantities start at one piece. Production pricing normally steps in from a few dozen upward, and we will tell you where the break points sit before you commit.
How fast can I get prototypes?
Straightforward milled or turned parts typically leave in 3 business days after DFM approval. Parts needing multi-axis work, hard alloys or external finishing run 5–7 days, confirmed in the quote rather than after the order.
What tolerances can you hold?
±0.01 mm is standard on most machined features; ±0.003 mm is achievable on small turned and micro-milled components. Anything tighter is reviewed per feature with its inspection method stated up front.
Is finishing handled in-house?
Anodizing, black oxide, plating, PVD, DLC, powder coating, bead blasting, electropolishing and heat treatment are coordinated under the same order, so cosmetic and hardness specs are met before shipment.
Do you ship delivered duty paid?
We quote DDP, FOB or CIF depending on destination. Air freight typically lands in 3–7 days; sea freight is used where volume makes the transit time acceptable.
Request a quote

Send a drawing. Get a real number.

Quotes include DFM feedback, so you know what to change before you commit to tooling. Most requests are answered within one business day.

Dongguan, Guangdong, China Mon–Sat · 08:30–18:00 GMT+8 All contact details
Scroll to Top